Southern Cross Freight Solutions
Client: Southern Cross Freight Solutions

Project Overview
In early 2025, Southern Cross Freight Solutions—a leading logistics provider based in Alexandria, Sydney—approached us with a critical challenge. As their operations expanded rapidly due to increased demand across domestic and regional routes, their existing warehouse space had reached capacity. With limited options for physical expansion and a firm commitment to staying within their current site, they needed an innovative solution that could significantly increase storage volume without disrupting their ongoing operations.
After an in-depth consultation and site inspection, our team identified a mezzanine floor system as the most effective and scalable approach. The solution would allow Southern Cross Freight to utilise previously unused vertical space, essentially doubling their usable area without altering the warehouse footprint. We also proposed reinforced concrete flooring to support the heavy machinery and pallet loads integral to their daily operations.
The project was completed in carefully planned stages, allowing business operations to continue seamlessly during construction. From concept and design to engineering, compliance, and installation, our team managed every step with precision and attention to safety.
This project not only delivered immediate spatial relief but also set up Southern Cross Freight Solutions for long-term efficiency, future growth, and operational flexibility. The new mezzanine system has become an integral part of their logistics workflow, supporting their continued role as a trusted partner in Australia’s supply chain.
The Challenge
Southern Cross Freight Solutions needed to double their storage capacity without relocating or expanding their warehouse footprint. The solution had to ensure uninterrupted daily operations and full compliance with Australian safety standards.
Our Solution
We engineered and installed a bespoke mezzanine floor system that fully leveraged the vertical space. To support heavy logistics equipment, we incorporated reinforced concrete flooring. The project was delivered in carefully staged phases to keep operations running smoothly throughout the installation.
The Results
The solution delivered a 95% increase in storage capacity with zero operational downtime. Over a year later, the mezzanine remains fully functional and issue-free. The client reports significantly enhanced efficiency across their warehouse operations.